Our Projects
Project Overview
Hertz Engineering Limited successfully executed the perimeter lighting improvement project for Newmont Ghana Limited’s Integrated Waste Management Facility (IWMF). The project aimed to enhance visibility, security, and operational safety by upgrading the existing lighting infrastructure around the facility’s perimeter.
Scope of Work
1. Site Assessment & Planning
- Conducted a detailed lighting audit to identify areas with insufficient illumination.
- Mapped out strategic locations for new light installations to ensure optimal coverage.
- Evaluated power availability, mounting structures, and environmental conditions for efficient lighting placement.
2. Supply & Installation of Perimeter Lighting
- Installed high-efficiency LED floodlights with motion sensors and dusk-to-dawn operation for energy savings.
- Deployed pole-mounted and wall-mounted lighting systems to cover all critical areas.
- Ensured proper wiring, grounding, and weatherproofing for long-term durability.
3. System Integration & Automation
- Integrated smart lighting controls for automated operation based on ambient light levels.
- Configured backup power solutions to maintain illumination during power outages.
- Conducted lux level testing to verify compliance with security and safety standards.
4. Safety & Compliance
- Ensured all installations adhered to OSHA, IEC, and Newmont’s internal safety standards.
- Conducted post-installation inspections to verify compliance with environmental and operational requirements.
- Provided training for Newmont’s security and maintenance teams on lighting system management.
Challenges and Solutions
- Challenging Terrain & Accessibility: Utilized specialized equipment for installation in hard-to-reach areas.
- Energy Efficiency Concerns: Selected low-power, high-output LED fixtures to reduce energy consumption while maximizing illumination.
- Weather Conditions & Durability: Used IP-rated weatherproof fixtures to withstand harsh environmental conditions.
Outcome and Impact
- Improved Security: Enhanced visibility reduced blind spots, minimizing security risks.
- Energy Savings: LED lighting reduced power consumption by up to 60%, lowering operational costs.
- Increased Safety Compliance: Improved visibility in hazardous areas, reducing accident risks for personnel.
Why Hertz Engineering?
Hertz Engineering is a leader in industrial and security lighting solutions, offering customized, energy-efficient, and compliant installations for mining and industrial facilities. Our expertise in smart lighting integration and safety compliance ensures optimal results for perimeter security improvements.







